Apartment for Sale in Paranhos, Porto

  • 419 900 €
  • 2 beds
  • 2 baths
  • 100 m²
  • Air Conditioning
  • Garage

Features

  • Condition: Under construction
  • AREAS: 81.00
  • AREA_B: 100.00
  • AREA_U: 81.00
  • GARAGE: 1
  • HAS_HEAT_PUMP
  • PROPERTY_BATHROOM: 2
  • PROPERTY_FLOOR: 13
  • PROPERTY_HAS_AC
  • PROPERTY_HAS_ACUSTIC_ISOLATION
  • PROPERTY_HAS_BEDROOM: 2
  • PROPERTY_HAS_DRYER
  • PROPERTY_HAS_ELEVATOR
  • PROPERTY_HAS_GARAGE: 1
  • PROPERTY_HAS_KITCHEN_HOOD
  • PROPERTY_HAS_LIVROOM: 1
  • PROPERTY_HAS_REFRIGERATOR
  • PROPERTY_HAS_STOVE
  • PROPERTY_HAS_WASHER
  • PROPERTY_NUM_FLOORS: 1
  • PROPERTY_NUM_PARKING_SPACES: 1
  • SE: 1
  • SEARCH_HASAC
  • SEARCH_HASELEVATOR
  • SUPERCASA_ELEVATOR_4
  • SUPERCASA_GARAGE_16: 1
  • SUPERCASA_HAS_AC_1

Description

2+1 bedroom apartment with 100 m2: Private area of 81 m2 + Balcony of 19 m2, with 1 parking space, for sale for €419,900

Located a few meters away on foot from the Jardim da Arca d'Água, in the former Campo do Salgueiros.

This new urban hub positions itself as one of the most solid investment opportunities in Porto. Close to the university area, with high demand (traditional rentals and students) and excellent accessibility to the center of Porto.

Large-scale project with significant urban impact, consisting of 4 towers, 3 residential towers and 1 tower dedicated to student accommodation. Each tower will have 12 to 14 floors, also integrating commercial spaces, services and a co-working area, promoting a balanced and dynamic lifestyle.

This development stands out for its contemporary and distinctive architecture, featuring large balconies, ample green spaces, and unit types ranging from 1-bedroom smart apartments to 3-bedroom apartments, all equipped to guarantee comfort, efficiency, and quality of life.

Key Features:

- Lake and green areas surrounding the buildings;
- Large balconies

Key Equipment:

- Air conditioning in all rooms
- Equipped kitchen
- Washing machine and dryer included
- Heat pump
- Thermally broken window frames
- Acoustic insulation
- Smoke extraction system
- Pre-installation for electric car charging (in units with parking)

Construction Planning:

- Urbanization already started: September 2025
- Infrastructure completion: September 2026
- Construction start: End of 2026
- Construction timeframe: 36 months

Reference: MMV-16584-DO3975SL

Listing date: 09/07/2026

Location

Related Searches